Product Demonstration
 GEONET >> GEONET

    New type geosynthetic construction HDPE material ,CE131 suitalbe for strengthening land , make the net mesh and road material into a whole ,can effectively disperse landing ,prevent land from breaking .Strengthen surface of road stability ,prevent surface from breaking .Bearmuch more loading capacity , save the material ,speed up construction.

Spec/Item CE111 CE121 CE131 CE131B CE151 CE152
Width(m) 2.50 2.50 2.50 2.00 2.50 1.25(double layer)

Mesh size (mm)

(8×6)±2 (8×6)±2 (27×27)±3 (22×22)±3

(74×74)±5

(74×74)±5
Thickness(mm) 2.90±1 3.30±1 5.20±1.5 4.80±1.5 5.90±1.5 5.90±1.5
Unit Weight (g/m2 445±30 730±35 600±35 600±35 550±30 550±30
Yield strength (KN/m)≥ 2.00 7.68 5.80 6.40 4.82 4.82
Elongation at max (%)≤ 41.00 20.20 16.50 18.60 23.20 23.20
Strength at 10% elongation (KN/m)≥ 1.32 6.80 5.20 5.74 3.83 3.83
Remark Futher discussion will be needed about products with special specification

    New type geosynthetic construction HDPE material ,CE131 suitable for strengthing land ,make the net mesh and road material into a whole ,can effectively disperse loading ,prevent land from breaking.

1)Strengthen surface of road stability ,prevent surface from breaking.

2)Bear much more loading capacity

3)Save the material ,speed up construction

CE131 suitable for strengthening road . Make granule filling and net mesh into a whole ,from the stable plane ,prevent filling and make vertical features ;in disgusting geographical features of the place ,adopting much more layers to strengthen.

1)Prevent road base from breaking and prevent dams and dikes of river from land sliding.

2)Strengthen road base ,slope of dams and dikes ,increse the stability of road base ,save the mesure of area of land.

3)Bear the much loading capacity

4)Shorten period of construction

5)In disgusting geographical features of the place ,construction can be continued

CE151 geosynthetic net applicable for protecting dams and dikes of river ,repairing coast ,tunnel project.

1)Project surface of dams and likes,aviod land sliding and flowing away water and land ,can be made into stone cage.

2)Suitable for sea and river construction ,Features ;force pliable and tough yet , fine permeability ,avoiding seawater erosion and adopting sea wave attracting energy.

 

CE121 Civil Engineering Net

It if used in slope protection, keeping apart and dealing with soft foundation.
1)When used in keeping apart, it can prevent the object, buried under the ground, from revealing. So it is used in sports ground, entertainment space, landscape area, discarded rubbish heap and dealing with foundation in open mining space.

2)When used in dealing with soft foundation, it can improve the resistance to lashing power and loading power. So it is used when the heavy machine and the rammer first come into the low-loading-power ground or marshland.

3)It is widely used as slope protection of lake bank, reservoir,ditch,dykes and dams, river bank and road slope, can prevent it from eroding away by wind and branch rivers. When plants grow up, the root and the net get entangled to from a stable slope, so as to protect permanently.

4)When it is flood season,CE121 can prevent soil on the dykes from dashing away by flood; when it is raining season, CE121 can guard against the damage from branch rivers; and when it is cold winter, CE121 can guard against the damage from branch rivers; and when it is cold winter, CE121 can avoid erosion from icy snow and freezing.

 
 

CE131 Civil Engineering Net

It is used to increase the road foundation and the road surface.
When it is used to increase the road foundation, the granular content, net and root of the plants are locked together, forming a stable surface to prevent the content from going down, and disperse the vertical loading. If the foundation is poor, many layers of CE131 can be used in order to strengthen.

1)To increase the slope of road foundation and dykes, to increase the stability of road foundation, to decrease occupied area.

2)To hold heavy loading

3)To prevent road foundation from plitting, and to avoid collapsing.

4)To reduce quantity of the material used in the road.

5)To speed up the construction.

 
 
Input time:2006-10-14 【Print this page 】 【back

| Home | About Us | Industry IN Information | Customer ServiceContact | Enterprise Post Office |

All rights reserved Weifang Hua Teng the plastic product limited company
Address:Shandong Lin qu paper mill industry garden
Tel:(86)-536-3490085    Fax:0536-3492999    Handset:(86)-013705361904